Plant Construction HVAC Design Project Manager

Konica Minolta

Project Mgr

Mechanical

About this role

This production-engineering function translates development teams’ plans into Konica Minolta’s own manufacturing facilities. The HVAC opening works from the plant owner’s side, covering new construction, extensions and renovations from initial concept through completion.

The engineer develops upstream designs for air-conditioning and ventilation, water supply and drainage, sanitation and utilities. Responsibilities include assessing locations, creating basic plans and basic-design drawings, preparing master schedules, selecting and commissioning contractors, and supervising work on site as the owner. A mentor supports onboarding, with future responsibility for leading entire plant-construction projects envisaged.

Applicants need at least five years as a designer or construction practitioner for HVAC and ventilation equipment in general building construction.

This is an AI-generated summary of the employer's original posting — details can be incomplete, out of date or simply wrong. Always confirm everything on the official posting before applying.