Manage water and sewer pipeline works for PPP projects, covering design checks, site surveys, contractor selection, schedules, budgets, safety, quality, permits and completion.
About this role
This pipeline construction management role sits in Kubota Environment Engineering’s Tokyo Maintenance Department, Maintenance Section 2. It supports aging water-pipe renewal within the company’s water-environment engineering work, linking design review, procurement preparation, coordination with authorities, and construction oversight.
Duties include checking design drawings; reviewing construction-order drawings; revising drawings in CAD; estimating and checking design documents; preparing ordering and application documents; and coordinating with relevant organizations. The role also supervises contractors, attends inspections, checks completed work and as-built drawings, revises CAD drawings, prepares revised estimates, and creates contract-change documents. CAD experience is not required.
Applicants must hold an ordinary driver’s license and a Civil Engineering Construction Management Engineer qualification or the corresponding assistant qualification. These are the posting’s stated mandatory requirements.
This is an AI-generated summary of the employer's original posting — details can be incomplete, out of date or simply wrong. Always confirm everything on the official posting before applying.